ourschoolboard.org

District overview

Linn J4 School District

Funding structure, how it compares to peers, and where major projects stand.

Editorial graphic for Linn J4 School District
Editorial caption by Our School Board; base: Carl Hårleman · public-domain

Who runs Linn J4 schools and how are they paid for?

Very small formula-funded district

Linn-Bloomfield J4 School District serves about 87 students in one school and is run by a five-member elected board. State aid and local property taxes pay for most costs, with a state revenue limit capping local spending. A 2024 referendum paid for capital projects completed in summer 2025.

Governance

A five-member elected board: Dan Kundert (president), Andy Schuerr (vice president), Amanda Geils (secretary), Heather Leedle (treasurer) and Bill Leedle. The board meets the second Tuesday of each month at 5:30 p.m.

One school

The district runs a single pre-K to grade 8 school, Traver School, in Lake Geneva, with about 87 students.

Open enrollment

For 2026-27 the board set no enrollment cap in regular education grades 4K-8 and said there is no space for new special education students because of staffing limits.

Shared services

CESA 2 provides the monthly balance sheet and a contracted firm provides technology support.

This page rests on only three months of posted minutes, so budget details, tax levy and enrollment trends are not covered.

Where the district stands

Students enrolled (federal data)context
87 students
Cash on hand reported by the treasurer, Aug. 11, 2026 (down from $1,122,554 on July 14)verified
812,279.86 dollars
Bus contract increase for 2026-27verified
2.5 percent

Major projects

Traver School summer 2026 construction

under way in summer 2026

Contractor JP Cullen was building a bathroom and custodial area. A new HVAC hood was installed and the gym floor was started. Two air-conditioning fans failed and replacement quotes were being gathered.

Next: [object Object]
  1. Work reported on schedule; HVAC hood installed July 9
  2. Board names a temporary contact for the contractor
  3. Bathroom nearly complete; gym floor started

Funding

Not stated (a 2024 referendum funded summer 2025 capital projects)

Possible 3K program

cost and feasibility study needed

A family asked the board to consider adding a 3K program.

Next: [object Object]
  1. Parent asks about a 3K program
  2. Administrator says a cost analysis and feasibility study is needed

Funding

Not determined

District administrator transition

new administrator contracted July 22, 2026

The previous administrator resigned effective July 17 and the board approved a contract for Andrew Grimm on July 22.

Next: [object Object]
  1. Resignation accepted
  2. Andrew Grimm approved as District Administrator/Superintendent

Funding

Not stated

Recent news

View the news feed →

Resources

Practical guides to school phone policies, district budgets, and administrator hiring.

Explore resources →

Built from three sets of scanned board minutes, two board policies and the district board page, covering March to Aug. 2026.

Get alerts for Linn J4 School District

We read every agenda, packet, recording, and set of minutes, and write up the decisions that affect families — each one linked to the document it came from.

Copy the RSS link into your feed reader to get new published alerts.